E22 + E20 Road Improvement

Client: Department of Municipalities and Transport (DMT)
Employer: KN International

Construction Cost: 15 Million AED
Project Scope: Design
Project Status: On-going​

Project Brief:

AE International together with its Infrastructure partner was awarded by the Department of Municipalities and Transport (DMT), Abu Dhabi to deliver a road improvement scheme along E20 Al Khaleej Al Arabi Street and the E22 Ramp, near Al Qana and the National Aquarium.

The project requires multidisciplinary coordination across Roads, Stormwater, Electrical, and Landscape disciplines to develop an integrated concept design for the corridor.

Design Concept:

The Landscape discipline is currently preparing survey scoping and concept design documentation, including site assessments of the E20 and E22 alignment.

This work supports the wider engineering design and DMT approval process, coordinating landscape input with the corridor’s roads, drainage, and utilities scope.

Crafting Resilient Connections

Built on Trust. Sustained by Excellence.

0%