Client: Abu Dhabi Transmission Company (TAQA Transmission)
Employer: Abu Dhabi Transmission Company (TAQA Transmission)
Cost : Confidential
Project Stages : PD, Final Design, EPC Tender, Site Supervision
Project Status : On-going Design Development
Project Brief:
TAQA Transmission required, under N-16888, a study of water-supply security for Al Ain, recommending new interconnections and isolation/control valves to improve system security, flexibility and redundancy.
The consultancy is split into two lots: modification/replacement works at existing Connection Points, and connection/segmentation works for existing Al Ain Transmission Pipelines.
Design Concept:
Lot 1 covers site surveys, investigations, optioneering, preliminary and final design, EPC tender documentation, tendering, bid evaluation and site supervision during construction and warranty.
Lot 2 covers site surveys, investigations, optioneering, feasibility studies, preliminary and final design and constructability studies, culminating in EPC tender document preparation.