Installation of Flow Monitoring for Wastewater Lines and Recycled Water Lines

Client: Abu Dhabi Sewerage Services Company (ADSSC)
Employer: Abu Dhabi Sewerage Services Company (ADSSC)

Cost : Confidential
Project Stages : CD, PD, DD, TD, IFC and Supervision
Project Status : Completed

Project Brief:

As part of ADSSC’s core strategic plan and DoE licensing requirements, ADSSC required identification of works needed to comply with the Wastewater Flow Monitoring Code of Practice across sewerage and recycled water networks.

Construction Supervision, Home Office Support and maintenance-period supervision are provided under Contract O-14655, covering supply, installation, testing, commissioning and certification of Regulated Flow Monitoring Points.

Design Concept:

The works equip Regulated Flow Monitoring Points with flow sensing elements, signal conversion, data processing and transmission, power supplies, and associated pipe and civil works.

Monitoring points span Abu Dhabi Region (43 no.), Al Ain Region (38 no.), Al Dhafra Region (70 no.) and a further 44 no. provisional points, giving ADSSC emirate-wide compliance coverage.

Crafting Resilient Connections

Built on Trust. Sustained by Excellence.