Client: MODON
Employer: Barari Natural Resources LLC
Project Area: 342 sqm
Project Scope: Design
Project Status: Ongoing
Project Brief:
Barari appointed AE International as Architect of Record (AOR) for boundary wall works located outside the residential plot limits, with the design already completed, reviewed, and approved prior to engagement.
The scope covers coordination, preparation, and submission of the Client-approved design documentation required to secure the Building Permit.
Design Concept:
The project scope is limited to boundary wall elements located outside the residential plot limits, covering concrete and blockwork boundary walls throughout the development.
Concrete and metal boundary fences complete the boundary treatment, matching the design language already approved for the wider Reem Hills Phase 1 community.




Built on Trust. Sustained by Excellence.
©2024, AE International Consultancy. All Rights Reserved