Additional Pumping Capacity at Mussafah

Client:Abu Dhabi Transmission Company PSC (TAQA Transmission)
Employer: KN International

Construction Cost: 250 Million AED
Project Stages: Design and Supervision
Project Status: On-going​

Project Brief:

TAQA Transmission required consultancy services to add pumping capacity at Mussafah Pumping Station, which serves Mussafah, Al Wathba and Abu Dhabi Island via its Lot D and Lot F pump groups.

The upgrade responds to rising demand across ICADs, MBZ City and Rabdan, and compensates for supply following the decommissioning of the UAN plant.

Design Concept:

The design adds 24 MIGD of capacity to Lot-F and 15 MIGD to Lot-D, along with 1.40 km of new DN1600 transmission line linking the pump station to the existing network.

The scope also includes piping to bypass the Mussafah tank farm and all associated civil, electro-mechanical, instrumentation and telecommunication works.

Crafting Resilient Connections

Built on Trust. Sustained by Excellence.

0%